Open Clamp Position
- Mass:
\(m_b = 0.178 kg\)
\(m_l = 0.1955 kg\)
\(m_r = 0.1955 kg\)
Base Slab
- Dimensions:
- Length = 0.005 m
- Width = 0.10 m
- Height = 0.05 m
- Local COM: \((0.002 m, 0.05 m, 0.025 m)\)
Left and Right Slabs
- Dimensions:
- Length = 0.10 m
- Width = 0.005 m
- Height = 0.05 m
-
Local COM (before offset):
\((0.05 m, 0.025 m, 0.025 m)\) - Offsets along the y-axis:
- Left slab: 0.010 m from origin
- Right slab: 0.085 m from origin
Global COM of Left and Right Slabs
- Left Slab COM:
\((0.05 m, 0.015 m, 0.025 m)\) - Right Slab COM:
\((0.05 m, 0.09 m, 0.025 m)\)
Approximate Hand Assembly COM
\(\text{COM}_{\text{hand assembly}} \approx (0.03498 m, 0.05172 m, 0.025 m)\)
Fusion 360 COM Computation
Fusion 360 calculated the COM as: \((0.038 m, 0.05 m, 0.025 m)\)
The computed values are reasonably close to the theoretical estimation.